February 2023
I had my Twin Disc MG50-50 rebuilt here. it failed in 8 months after install. (14 months total after rebuild) with around 250 hours. I had it rebuilt elsewhere and the shop I used said it was poorly done. the pump spring failed causing the transmission to fail.Complete waste of $6,000 not including the crane and the labor.